Please use this identifier to cite or link to this item:
https://hdl.handle.net/2440/98409
Citations | ||
Scopus | Web of Science® | Altmetric |
---|---|---|
?
|
?
|
Type: | Journal article |
Title: | Flexible operation of CSIRO’s post-combustion CO₂ capture pilot plant at the AGL Loy Yang power station |
Other Titles: | Flexible operation of CSIRO's post-combustion CO(2) capture pilot plant at the AGL Loy Yang power station |
Author: | Bui, M. Gunawan, I. Verheyen, V. Feron, P. Meuleman, E. |
Citation: | International Journal of Greenhouse Gas Control, 2016; 48(2):188-203 |
Publisher: | Elsevier |
Issue Date: | 2016 |
ISSN: | 1750-5836 1878-0148 |
Statement of Responsibility: | Mai Bui, Indra Gunawan, Vincent Verheyen, Paul Feron, Erik Meuleman |
Abstract: | Abstract not available |
Keywords: | Post-combustion CO₂ capture; Flexible operation; Pilot plant; Transient; Dynamic modelling |
Description: | Available online: 15 January 2016 |
Rights: | © 2015 Elsevier Ltd. All rights reserved. |
DOI: | 10.1016/j.ijggc.2015.12.016 |
Published version: | http://dx.doi.org/10.1016/j.ijggc.2015.12.016 |
Appears in Collections: | Aurora harvest 7 Entrepreneurship, Commercialisation, and Innovation Centre publications |
Files in This Item:
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.