Type: | Journal article |
Title: | DSM methods to improve planning and scheduling in asset management |
Author: | Gunawan, I. |
Citation: | Asset Management and Maintenance Journal, 2012; 25(1):50-55 |
Publisher: | Engineering Information Transfer |
Issue Date: | 2012 |
ISSN: | 1835-789X |
Statement of Responsibility: | Indra Gunawan |
Abstract: | In this paper, the Design Structure Matrix (DSM) method is presented to improve planning and scheduling in asset management. The main advantage of the DSM over traditional project scheduling tools such as Critical Path Method (CPM) or Gantt chart is in compactness and ability to present an organized and efficient mapping among tasks that is clear and easy to read regardless of size. Three DSM methods: Path Searching, Powers of the Adjacency Matrix, and Reachability Matrix methods are discussed. As a case study, DSM methods are implemented to reduce design iteration or rework in an engineering project. New project duration is optimised compare to initial project duration. |
Rights: | © Engineering Information Transfer |
Appears in Collections: | Aurora harvest 7 Entrepreneurship, Commercialisation, and Innovation Centre publications |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
hdl_98455.pdf | Published version | 882.38 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.