Please use this identifier to cite or link to this item:
https://hdl.handle.net/2440/86604
Citations | ||
Scopus | Web of Science® | Altmetric |
---|---|---|
?
|
?
|
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Zhao, Z. | - |
dc.contributor.author | Lv, Q. | - |
dc.contributor.author | Zuo, J. | - |
dc.contributor.author | Zillante, G. | - |
dc.date.issued | 2010 | - |
dc.identifier.citation | Journal of Construction Engineering and Management, 2010; 136(6):659-669 | - |
dc.identifier.issn | 0733-9364 | - |
dc.identifier.issn | 1943-7862 | - |
dc.identifier.uri | http://hdl.handle.net/2440/86604 | - |
dc.description.abstract | Changes are the main causes of delays and cost overruns in construction projects. Various change management systems have been developed to minimize the impacts of changes and to facilitate good project management. This paper presents a change prediction system using activity-based dependency structure matrix (DSM) to facilitate change management. DSM is used to model the process that may occur as a result of changes. Consequently changes can be predicted by setting the change criteria for each activity in the form of rework scope. Furthermore, Monte Carlo simulation is introduced to analyze the change probability of activities involved in construction projects. The effectiveness of the prediction system is verified by applying this system to an office building project. This study provides a useful tool for project management teams to manage changes proactively and efficiently. | - |
dc.description.statementofresponsibility | Zhen Yu Zhao, Qian Lei Lv, Jian Zuo, and George Zillante | - |
dc.language.iso | en | - |
dc.publisher | American Society of Civil Engineers | - |
dc.rights | © ASCE 2010 | - |
dc.source.uri | http://dx.doi.org/10.1061/(asce)co.1943-7862.0000168 | - |
dc.subject | Construction project management; Change management; Prediction; Information flow; Dependency structure matrix | - |
dc.title | Prediction system for change management in construction project | - |
dc.type | Journal article | - |
dc.identifier.doi | 10.1061/(ASCE)CO.1943-7862.0000168 | - |
pubs.publication-status | Published | - |
dc.identifier.orcid | Zuo, J. [0000-0002-8279-9666] | - |
Appears in Collections: | Aurora harvest 2 Geology & Geophysics publications |
Files in This Item:
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.